Applications

From cold chain to steel mills

Six application categories — wherever a copper pipe needs a gap-free thermal bond to a metal wall, or a joint needs to survive extreme temperatures.

QR code — scan to watch Jeet Chemical videos

Scan to Watch Videos

Refrigeration & Cold Chain

Bond copper coolant pipe directly to the inner wall of any freezer or display cooler — gap-free contact, no soldering.

  • Defreezers
  • Glycol Defreezer
  • PCM Freezer
  • Counter Defreezer
  • Table-type Defreezer
  • Wine Table Freezer
  • Visi Cooler
  • Glass-top Display Counter
  • FOW (Freezer on Wheel)

Water, Milk & Bulk Coolers

High-grip bonding for coil-to-shell assemblies that need consistent heat transfer and zero corrosion over years of duty.

  • Water Cooler
  • Milk Cooler
  • Bulk Cooler
  • Stainless-steel Cooler Shells

Ice-cream & Cooling-Stone Machines

Direct paste-to-stone bonding for cooling tawas and stones — better cooling efficiency without solder spots.

  • Tawa Ice-cream Machine
  • Cooling Stone Ice-cream Machine
  • Round / Square Cooling Plates
  • Hardener Machine
  • Ice-cream Rolling Machine

Medical & Laboratory Freezers

Stable from −80 °C to +150 °C — ideal for sensitive vaccine, plasma and dead-body chambers as well as routine lab equipment.

  • Vaccine Carrier Deep Freezer
  • Plasma Deep Freezer
  • Lab & Medical Deep Freezer
  • Stability Chamber
  • Dead Body Chamber
  • BOD Incubator
  • Vacuum Oven
  • Autoclave

HVAC & Heat Exchangers

Improve coolant-pipe-to-shell heat transfer in AC, chillers and cooling towers. Seal AC coil chillers without brazing.

  • AC & Chiller
  • Cooling Tower
  • Heat Exchanger Bonding
  • Compressor Coil Mounting
  • AC Coil Chiller (no brazing)
  • Ice-box Leakage Proofing

Heavy Industry & Sealing

High-temperature sealing, gap-filling and crack repair for plants where joints must outlast vibration, thermal shock, oils and acids.

  • Steel Plants
  • Cement Factories
  • Ceramic Flue Pipes
  • Vitreous Enamel Joints
  • Cable Joints
  • Boat Crack Fill-up
  • Concrete & Pumice Block

How to Apply

Four steps, one technician

  1. 1

    Clean Surfaces

    Remove all grease, dust and old adhesive with isopropyl alcohol (thinner). Surfaces must be fully dry before application.

  2. 2

    Mix 5 : 1 Ratio

    Combine 200 gm Paste + 40 gm ISO (MDI). Mix thoroughly until a smooth, uniform consistency is achieved.

  3. 3

    Apply & Press Firmly

    Ensure proper alignment while maintaining maximum contact with the cabinet body. Apply solder spots if required. Spread an even 1–2 mm layer over the copper pipe.

  4. 4

    Cure — 40 Min Set

    Initial setting time: 40 minutes. Puff can be applied after 40 minutes. Full curing is achieved within 24 hours.

Precaution: store in a cool, dry place with the container tightly closed to avoid moisture and water contact.

Not seeing your application?

We custom-tune curing time, temperature range and substrate compatibility. Send us your bonding or sealing problem.

Talk to an engineer